Note
Impoundment of the Aswan Dam in Egypt |
Collection title
Five columns to the oneID
INA00567Source
INA (FR)First broadcast date
01/08/1965Production year
1965Abstract
From May 13 to 16 Egypt lived four days of celebration to mark the official impoundment of the famous Aswan Dam. It required 35000 workers for four years and five months; it will allow, in a few years, the regulation of the Nile, the irrigation of new lands and the production of ten billion KW/h per year. It has cost 4.8 billion francs of which the bulk was supplied by USSR; Nikita Khrushchev was with Nasser for the inauguration.Type
videoProduction companies
- ORTF - Own production
Broadcaster
ORTFAudiovisual form
MagazinePersonalities
- Nasser Gamal Abdel
- Kroutchev Nikita
Primary theme
Water issuesSecondary themes
- Contemporary historical challenges 19th-20th c.
Period of events
- 1965
Map locations
- Egypt - Upper Egypt - Aswan
Original language
FrenchMedia running time
6m52Additional information
"Response of the Office of Rights 01/25/1996: - Sequence "The Nile, Aswan Dam" duration 6'45 ". - This sequence belongs to the Egyptian television (the United Arab Republic in Cairo). At the time, this sequence was negotiated through the Egyptian Embassy in Paris: Mr. Abdel Amer (Director of the Center for Information and Press, 56, Avenue of Iena- Paris.
Transcript
Similar content by :
Theme (60)
Collection (21)
Date (14)
Samia’s journey
Samia’s journey
SOREAD-2M (MA)
06/29/2006 - 39m45sArabic
The engineers of water
The engineers of water
SOREAD-2M (MA)
03/22/2010 - 7m26sArabic
Rivers
Rivers
SOREAD-2M (MA)
02/06/1995 - 25m44sArabic
Water, a rare capital
Water, a rare capital
SOREAD-2M (MA)
04/29/2010 - 21m41sFrench
page 1 of 15
View 1 - 4 of 60